Clean Water Coalition SCOP Effluent Pumping Station

Henderson, Nevada

DLT&V designed the electrical, instrumentation, and control systems for SCOP Effluent Pump Station project.  The electrical design included two 12.47kV underground distribution lines from the existing City of Henderson sub station. A new vacuum drawout circuit breaker was installed at the sub station switchgear. Distribution lines feed two new transformers and a new 480 volt switchboard. DLT&V provided design for motor controls, field instruments, transfer switch sizing, building and site lighting, control descriptions, instrument and electrical specifications, opinion of probable cost, and connections to CWC Control System.