Gilbert Design-Build Water Treatment Plant SCADA Changeout
Gilbert, Arizona
During the expansion of the Town’s Water Treatment Plant, DLT&V was selected to complete a change-out of the existing WTP control system as a sub-contractor. The water treatment plant facility is currently being expanded to process 45MGD. Design services included preparation of electrical plans, detailed fabrication drawings, and bill of materials for preparing the Guaranteed Maximum Price (GMP) for the Phase 2 Construction Contract. During the construction phase, DLT&V also completed a conversion from Wonderware InTouch version 7.1 to Wonderware InTouch version 9.5 and implemented Wonderware’s Industrial Application Server (IAS).